| Total capacity | 48 kW |
| Client | HEVEL KAZAKHSTAN LLP |
| Фото | |
| Solution |
The power supply of the construction camp as part of the building of a 50 MW solar power plant in Kazakhstan In September 2020, Techexpo LLC delivered to Kazakhstan a 48 kW incased diesel generator of the 2nd degree of automation for the power supply of a construction camp as part of the building of a 50 MW Kentau solar power plant. The DG FG WILSON P65-5 package includes a CTI 100 automatic transfer switch, a PW 2.1 control panel with the possibility of remote monitoring under the Modbus protocol via RS 485, a charger, and a liquid heater. The solar power plant construction is carried out by the Hevel group of companies through an affiliate of HEVEL KAZAKHSTAN LLP. The commissioning of solar power plants is scheduled for 2020, electrical supply will be carried out to the Unified Electric Power System of the Republic of Kazakhstan. Hevel is actively building solar power plants in the Russian Federation and Kazakhstan: in Kalmykia, the 2nd stage of the Maloderbetovskaya solar power plant 45 MW and the 3rd stage of the Yashkulskaya solar power plant 25 MW will be built, in Buryatia - the 1st and 2nd stages of the Torey solar power plant 25 and 20 MW, in the Saratov region - the 1st stage of the Dergachevskaya solar power plant 25 MW, in the Omsk region - Novovarshavskaya solar power plant 30 MW, in Adygei - Adygei solar power plant 4 MW and Shovgenovskaya solar power plant 4.9 MW, in the Krasnodar Krai - Labinskie solar power plants (9 plants of 4.9 MW) with a total capacity of 44.1 MW. In Kazakhstan, in March 2020, the construction of the largest facility was completed - 100 MW Nura solar power plant, by the end of 2020 it is planned to build 50 MW Kentau solar power plant, 20 MW Shymkent solar power plant, 3 MW Kapshagai solar power plants, 4.95 MW Sarybulak solar power plants, 10 MW Kushata solar power plants and 50 MW Shoktas solar power plant. |