| Total capacity | 3600 kW |
| Client | Sininda-1 Prospectors Artel LLC |
| Фото | |
| Task | Implementation of a technical re-equipment program for a large gold mining deposit in 2024. |
| Solution | Development of the main technical solutions (MTS) of the energy center of the mining site with a capacity of 3.6 MW, manufacturing and supply of two automated container-type power plants based on a Cummins diesel engine and a closed 6/0.4 kV container-type switchgear to the Customer's site, installation supervision and commissioning works equipment. |
List of equipment supplied under the project:
Climatic characteristics, wind loads, and seismicity of the construction area were taken into account in accordance with the current updated Codes of Practice and climate maps of the Russian Federation.For all types of equipment, Techexpo provided a complete set of technical and operational documentation in Russian (Technical information, Operating Instructions, Installation and Commissioning Instructions, Passport).The warranty for all supplied materials and equipment extends for 12 months from the beginning of the calculation of the warranty period — from the moment the equipment is shipped from the manufacturer.