| Total capacity | 65 kW |
| Client | RusGidro JSC (Zagorskaya PSPP) |
| Фото | |
| Solution |
In January 2022, Techexpo delivered a 65 kW TE.60S-T400-2RN encased DG based on an FPT (Iveco) NEF45SM3 engine with an EMSA EGK225-70N (Turkey) current generator for Zagorskaya hydroelectric power station. The dimensions of the encased DG - 2600х1000х1535 mm, weight – 1238 kg. Zagorskaya hydroelectric power station (part of RusGidro PJSC) is located on the Kunya River near the village of Bogorodskoe in the Sergiev Posad district of the Moscow region. It serves daily peak loads in the Moscow and Central energy systems. The first phase of the Zagorskaya HPS with a power of 1200 MW was built in 1980-2003s, since 2007 the construction of the 2nd phase with a power of 840 MW has been underway, after completion of which the Zagorskaya HPS will become the largest power station in the Moscow region.
|