| Total capacity | 160 kW |
| Client | Salyut JSC UEC manufacturing complex |
| Фото | |
| Solution |
Providing a manufacturing complex DC with redundant electrical power
In November 2020, Techexpo completed work to provide a Salyut JSC United Engine Corporation (UEC) manufacturing complex data processing center (DC) with redundant electrical power. This is the largest machine-building complex, which designs and builds aircraft engines, provides maintenance services and carries out designer's supervision in the companies operating aircraft engines.
To accomplish the task, Techexpo:
The Techexpo construction team built the diesel genset foundation with a waterproofing layer, installed the ground loop and laid 0.4 kV cable lines and control circuits from the diesel generator set to the consumer (DC). The route length indoors is about 120 m, about 15 meters of the route were laid in the trench in the ground, with the subsequent recovery of asphalt covering. After the foundation preparation and power supply line laying, the diesel genset was installed on the foundation and electrical facilities were installed in the data center premises (diesel genset automatic transfer switch). All the operation modes of the diesel genset (no-load and on-load) and available start/stop methods were tested, the performance of the utility systems of equipment was checked: fire alarm and ventilation systems, the working sequence of switchboards was checked, inspection reports and test certificates for installed electrical equipment were drawn up. Equipment was visually inspected concerning service fluids spills. Upon completing construction and installation works and checking all working systems, the diesel genset was handed over to the representatives of UEC JSC – Salyut manufacturing complex with as-built documentation, namely:
A briefing was provided for the diesel genset maintenance staff. |