Total capacity | 1210 kW |
Client | China National Chemical Engineering & Construction Corporation Seven, LTD (CC7) |
Фото | |
Solution |
To deliver a 1210 kW power supply package to a building site of a plant processing ethane-containing and liquefied natural gas for a working camp in Ust-Luga In December 2021 – March 2022 Techexpo delivered to CC7 company a power supply package of 12 encased DGs with a total capacity of 1210 kW for constant power supply to the camp for the plant builders (Baltic Chemical Complex, RusGazDobycha). China National Chemical Engineering & Construction Corporation Seven, LTD is building a large complex for the processing of ethane-containing gas and the production of liquefied natural gas (LNG) in the Ust-Luga region (Leningrad region). The power supply package of 12 encased DGs with a total capacity of 1210 kW for constant power supply of the plant builders' camp (Baltic Chemical Complex, RusGazDobycha) includes:
All 12 DGs were load tested before shipping. The gensets were shipped on time, and Techexpo engineers carried out commissioning and final adjustment at the facility.
|