| Client | Ust Kut regional hospital |
| Фото | |
| Solution |
In 2020, Techexpo LLC delivered a package fire-fighting station for a unit accommodating 60 patients with community-acquired pneumonia of Ust Kut regional hospital Regional Public Health Facility. Under the project, Techexpo LLC acted as an EPC contractor: developed technical documentation for fire extinguishing system design (technology solutions, out-door plumbing systems, electric power supply, integrated automation), delivered a pump unit with two pumps Leo XST50-200/110 (1 main + 1 standby), piping and stainless steel collectors, a control cabinet and a remote control panel, as well as a 100 m3 submerged water tank. Construction and installation operations with pipeline supply from the tank were carried out at the site. See annexes in the Drawings tab (below): Technology Solutions section, 25 sheets: fire-fighting station layout design, layout design of equipment and tanks in the chamber, piping, pipeline pass-through units, ventilation piping, metal stand. Integrated automation section, 54 sheets: project summary, block diagram, fire and security alarm components layout diagram, electric schematic diagram, steamer operation algorithm, automation functional diagram, cabling diagram, drawings list (technology solutions, out-door plumbing systems, electric power supply), cable log, pump control board and remote starter design documents.
Power supply system section, 42 sheets: cable routing schemes, electrical equipment layout, internal ground loop layout.
|